Rectorate Building, Meeting and Conference Halls
Work Description
Manufacture of 2 conference halls of 250 seats, acoustic and decorative wall panels (980 m2), plain wooden wall and ceiling panels (240 m2) and lacquered vaulted wood ceiling (450 m2)
Manufacturing Period
2 months
Mounting Period
1 week
Rectorate Building, Ballrooms
Work Description
2 ballrooms, laminated ceiling, fabric (900 m2) and laminated wall panels (1750 m2) and movable panel claddings (950 m2of fabric coating, 500 m2 of laminated coating)
Manufacturing Period
1 month
Mounting Period
2 Weeks
Rectorate Building, Presidential Floor,Presidential Meeting Rooms and Presidential Office
Work Description
Engraved special movable furniture, all fixed wooden works (450 m2) and 14 fire-resistant doors
Manufacturing Period
2 months
Mounting Period
1 week
Classrooms of the Faculty of Business Management and Public Policy
Work Description
Acoustic wall lining, (1100 m2) carpet underlays and 55 acoustic doors of 18 class rooms
Manufacturing Period
1 month
Mounting Period
3 weeks
Conference Room of the Faculty of Business Management and Public Policy
Work Description
Acoustic panel wall lining (800 m2) and vaulted acoustic ceiling lining (420 m2)
Manufacturing Period
1 month
Mounting Period
2 weeks